Why Choose AC Charging for Commercial Sites
Discover the key benefits of AC charging solutions for your commercial property
Lower Deployment Cost
85% lower CAPEX compared to DC fast charging, with simpler installation requirements and reduced electrical infrastructure costs.
Ideal for Long Parking
Perfect for 4-10 hour parking scenarios like employee parking, residential parking, and business park applications.
Scalable Deployment
Easily scale from 2 to 100+ charging points with modular design and phased deployment capabilities.
Smart Management
Advanced features including APP control, RFID access, OCPP platform integration, and dynamic load balancing.
Typical Applications
Tailored AC charging solutions for different commercial environments
Office Buildings
6-9h ParkingCost-effective solution for daily employee charging needs during work hours.
Business Parks
4-8h ParkingHigh-power solutions supporting multiple businesses and visitors.
Residential
8-12h ParkingPerfect for overnight charging with easy billing management for residents.
Hotels & Retail
2-6h ParkingValue-added service enhancing customer experience and property appeal.
How to Choose the Right AC Charging Configuration
Find the optimal charging solution based on your specific requirements
Selection Criteria
Parking Duration
Electrical Supply
Single Phase
7kW maximum power output
Three Phase
Up to 22kW power output
Application Goal
| Scenario | Parking Duration | Recommended Power | Charger Type |
|---|---|---|---|
| Office | 6–9h | 7kW / 11kW | Wallbox / Pedestal |
| Apartment | Overnight | 7kW | Wallbox |
| Business Park | 4–8h | 11kW / 22kW | Pedestal |
| Hotel | 2–6h | 11kW / 22kW | Pedestal |
| Fleet Parking | 8+h | 7kW / 11kW | Wallbox |
Need personalized advice?
Our engineers can help assess your site and recommend the optimal configuration based on your specific needs.
Ask for Charging Configuration AdviceRecommended AC Charger Series
High-performance, reliable charging solutions for commercial applications
W Series AC Chargers
The W Series AC chargers are specifically designed for commercial applications, offering reliable performance, smart connectivity, and flexible installation options.
Power Options
7kW / 11kW / 22kW
Installation
Wall-mounted & Pedestal
Connectivity
RFID / App / OCPP
Load Management
Dynamic Load Balancing
Technical Specifications
Project Reference
Scope: 100 x7kW AC Charging Stations
100 x7kW AC Chargers Challenge:
limited transformer capacity
Solution:
Smart load balancing + phased deployment
Result:
reduced peak demand and optimized parking coverage
AC EV Charger System Architecture Diagram
Project schematic diagram
| Category | Parameter | Specification |
|---|---|---|
| Power Supply | Transformer Capacity | 800 kVA - 1000 kVA |
| Power Supply | Input Voltage | 230V, Single-Phase (L+N+PE) |
| Communication | Interfaces | 4G / Ethernet (RJ45) |
| Communication | Protocols | OCPP (Backend), Modbus RTU (Local) |
| Wiring | Cable Type | YJV / YJY |
| Wiring | Conductor Size | 3 x 6 mm² (Live, Neutral, Earth) |
Why Work With Us
Comprehensive support from assessment to deployment and beyond
Site Assessment Support
Professional evaluation of your parking facilities, electrical infrastructure, and usage patterns to determine optimal charging solutions.
Product Selection Guidance
Expert recommendations based on your specific project requirements, considering power needs, installation constraints, and budget considerations.
System Design & Documentation
Detailed system architecture plans, electrical drawings, and technical specifications to ensure smooth implementation and compliance.
Global Market Certification
Products certified to meet international standards including CE, CB, UKCA, and local regulations for reliable global deployment.
Platform Compatibility
Seamless integration with OCPP platforms, building management systems, and third-party applications for unified operations.
Technical Support
Dedicated support team providing installation guidance, commissioning assistance, troubleshooting, and ongoing maintenance services.
Certified, Connected, and Ready for Deployment
Meeting global standards for reliable integration
Certifications
Compatibility & Connectivity
Protocol Support
| · OCPP 1.6J / 2.0.1 | · Modbus TCP/RTU |
| · MQTT | · REST API |
User Access Methods
Mobile App
RFID Card
PIN Code
Frequently Asked Questions
Common questions about commercial AC charging solutions
The optimal power level depends on your parking duration and electrical capacity. For overnight or 8+ hour parking, 7kW is sufficient and most cost-effective. For 4-8 hour parking (typical workday), 11kW offers a good balance. For shorter 2-6 hour parking or higher throughput, 22kW provides faster charging when needed.
Yes, AC charging is ideal for office parking lots where employees typically park for 6-9 hours. The 7kW or 11kW options provide sufficient charging during the workday while keeping deployment costs lower than DC fast charging. Smart load balancing ensures efficient use of available electrical capacity.
Yes, our commercial AC chargers support multiple access methods including RFID cards, mobile apps, and PIN codes. This flexibility allows you to implement the access control system that best fits your business needs, from simple employee access to paid public charging.
Absolutely. All our chargers are OCPP 1.6J and 2.0.1 compliant, ensuring seamless integration with any standard OCPP charging management platform. This gives you the flexibility to choose your preferred software provider or use our comprehensive cloud management solution.
To provide an accurate solution proposal, we typically need information about your parking facility (number of spaces, typical parking duration), electrical infrastructure (available capacity, single or three phase), project goals (employee charging, public access, revenue generation), and any specific requirements or constraints. Our team can guide you through the assessment process.
Get a Commercial Charging Solution Proposal
Tell us about your project requirements and our team will recommend the optimal AC charging solution for your site.
Response Time
Our team typically responds within 24 hours with an initial assessment and will provide a detailed proposal within 3-5 business days.


